PVC Maintenance Shaft
With unique design properties and seamless operational value, the PVC Central Axis Maintenance Shaft offers a new solution for wastewater applications that replaces traditional concrete manholes.
Celebrating 10 years of operations.
Read about our journey.The project involved the delivery of multiple Central Axis Maintenance Shafts (CAMS) for Sydney Water to Riverstone, NSW. These CAMS play a critical role in the conveyance of waste water from the new homes of 35+ families moving into the area.
Almost 300 meters of DN150 sewer pipe was installed at grades as shallow as 0.80%. Even though this installation was designed at a depth of over three meters, CAMS proved to be an invaluable asset to the constructor.
The CAMS have been recently appraised by the Water Services Association of Australia (WSAA) to WSA137, which is industry standard for maintenance shafts and sewage chambers.
The product is rapidly gaining momentum in Australia, with seven CAMS being installed to one manhole in this wastewater application alone. Its unique advantages are recognised by Sydney Water Corporation Water Service Co-ordinators (WSC’s) and constructors alike.
The flexible design features of the Central Axis Maintenance Shaft mean that each unit is bespoke—CAMS are manufactured to specific project and application needs. Clover supplied this project within three working days of order placement, with manufacture made entirely to the Riverstone project’s specifications.
CAMS are easier to install when compared to the complex concrete formwork required when installing manholes. Where a manhole may take 1-2 weeks, a Maintenance Shaft can be installed in minutes. There is no requirement of waiting for concrete to dry, and each one can be installed consecutively—reducing cost of labour and man hours.
Its PVC construction is lightweight, robust and strong. This allows for easier handing by installers, and lower weight when shipping.
The compact size of the product means that its small footprint requires less excavation and reduced spoil.
The custom designed product can achieve almost any deflection, grade and invert to allow for a flexible, unique fit.
Each Central Axis Maintenance Shaft used in the project was specifically designed to fit the desired grade and angle using a custom-built CNC machine.
Each inlet takes approximately 60 seconds to cut, at an accuracy of +0.02. The Maintenance Shaft system is manufactured to the requirements of AS/NZS4999, specific to PVC-U maintenance shafts.
The Riverstone project is an example that showcases innovation in everyday applications, allowing projects to simplify access and installation of infrastructure.
To request a quote, or for more information on our Central Axis Maintenance Shaft, you can learn more by visiting our product page or by requesting a specialised order form via our website.
They [the Central Axis Maintenance Shafts] were fantastic to install. They were faster to lay and were perfectly aligned in the trench due to the accuracy of CNC manufacturing.
Project Contractor
With unique design properties and seamless operational value, the PVC Central Axis Maintenance Shaft offers a new solution for wastewater applications that replaces traditional concrete manholes.
Clover's Drainflex™ subsoil pipe is manufactured to AS2439.1 from premium quality HDPE material for below ground drainage applications.
PVC-U Drain Waste and Vent (DWV) and Stormwater pipes create valuable efficiencies in specialised stormwater and wastewater applications.
Get in touch with our team for additional information on product pricing, technical data, project support and more.
Get in touch with our team so we can support the planning, source, and supply of your next project.
We endeavour to reply within 1 business day.
Thanks for getting in touch, we will respond as quickly as possible.
If you have an urgent matter, please call your nearest Clover branch.